| Folks;
Any comments welcomed, especially from someone who has experience.
The question boils down to this:
Is it feasible or even possible to run a pair of trace C60's in parallel on the same battery bank to increase the Load Diversion [dump load] capacity? Hypothetically it would be on a 24 volt system that occasionally goes over the rating for the C60.
My first thought was that you could slightly offset the trip points so that one is "primary" and one is "secondary". Perhaps they would work just fine in parallel with same settings but I thought I should see what the savvy folks here thought of the idea before i go further on planning this hypothetical system.
Thanks in advance for your time.
Cheers.
TomW |
|
|