Rigging a gin pole
|
|
By frackers, Section Wind Posted on Wed Jan 07, 2009 at 11:10:48 PM MST
|
So how do the guy wires connect to a gin pole when pulling up a mast
|
 |
| I've got my 11m 100mm steam pipe mast fixed to its swivel base and the guy wires set up for the two sides and the backstop (a very conventional setup of 4 wires at 90 degrees to each other). I'm not sure how to use the gin pole so I'll tell you where I've got to so far.
The gin pole is 4m long and fits into the swivel base of the mast at 90 degrees to it - pretty obvious so far!! I have 4 links of 2 tonne chain welded to the top of the gin pole so I can choose where I connect a shackle onto the 'front' guy wire which has been made with a turnbuckle adjuster at 10.8m down so there is an attachment point for the gin pole. Is this right or should I just arrange for the guy wire to slide through a shackle on the end of the gin or should it be attached as I have it,
From the turnbuckle, I have two wire ropes - a short one which will connect onto the anchor point and a longer one, on a shackle I can remove once erected, that I can hitch onto the tractor to pull the whole lot up. This is where I hit a problem!!
As I pull up, everything is fine until I reach the point at which I have a straight line from the top of the mast, through the top of the gin pole to the back of the tractor. At this point I have to remove the shackle from the guy wire to the gin pole otherwise I'm pulling the gin pole out of its socket at the swivel base as I drive the tractor away. I also end up with the tail that should connect to the anchor point being up in the air.
Possible solutions:
- run the 'pullup' wire through the anchor point, so the guy wire is lined up to shackle the wire to the anchor - this means disconnecting from the gin pole at some point but probably lower down that my current (failed) attempt
- run the 'pullup' wire through a pulley 4m out from the swivel so that the gin pole is pulled straight down to the horizontal - this means that the tail going to the anchor point won't reach until I disconnect from the top of the gin pole. I will also need to cast in a tonne of concrete as it will be a vertical pull!
- use a totally separate 'pullup' wire from the top of the mast via the gin pole so that the front guy wire hangs loose until I connect it to the anchor - this requires another trip into town to get another wire rope made up and I end up with a wire dangling off the mast all the time it is up.
So what is recommended?
Cheers |
|
|
Total Views
|
|
142 Scoop users have viewed this posting.
|
|