Hi Everyone
I finally got my hands dirty, and started to weld some iron and begun to build my 10ft wind generator. Just like Hugh 10Ft machine 24V

I known, i known... i still need to re-enforce the connection between the Hub to Yaw pipe :)
The Hub has only four holes to insert the M12 studs.(pictures shows 6 but only 4 are fully drilled)
->Is it ok for a 10ft machine having 4 or should i drill 4 more holes in it in a total of 8?
->If i only drill 2 more holes (total of 6), will it get unbalance when spinning?
Other Questions..is there a problem when:
->Deviation in tail angles? (the 20 degrees is ok, but i believe i don't have the 35 degrees accurate..maybe +/-2 degrees angle..hard to check)
-> The alternator offset is 13,3mm (not 12,5)
-> Yaw pipe is 75mm diameter not 60.3.
Ill post more pictures when all mechanical parts are finished...
This are just simple questions to be on the safe side.
Kind regards from Portugal
Goahead