Scored in 2008,

Track light, or UniStrut maybe
This six section, cut/unbolted into three sections.
Total length will be 40', less base and pipe stub top.


Bottom side, will need base and tip up type using the half inch round tubes and letting the UniStrut leg be the pulled on leg,,.. maybe?
might fix the built in wires, that got a hack up job the removers did on it, only cut in two spots. All four wires.





Will put some plugs of all thread or something weldable into the round hollow corners

The top end


The solid triangle rods, .2"OD. 13" spacing between welds on any leg, (half that to the next weld on the other leg).
I'll strengthen up the welds with my little wire feed as soon as the couple feet of snow melts off.


The round tubes are 9 1/2" apart center to center. The tube to UniStruts closest welded on corner is 8 1/2".

I know pretty small but a better Anemometer tower
at the minimum.
I'll put my Ametek 30 on the top, soon, I hope!
