Got the rotor plates finished, they look better than I would have though. Cut the rest of the materials for the metal work gotta get it tack welded and over to Wil.
ended up with 40 of those ups12-170fr batteries. put 3 strings of 10 on float. got the other ten on a shelf. guess I'll rotate strings so none of the batteries sit for more than a month.
got a 49' rohn 20 tower (4 sections and the top part). least it was free.
God I need a break in the weather.