After 2 days of hard work the turbine is flying 80 feet up.
We hoisted and set it yesterday, I got tired yesterday evening and did not get the wiring finished.

It is fairly stressfull climbing and working 80 feet up all day.
My brother and I both climbed to the top and bolted the tower stub to the tree, then hoisted the alternator / blade assembly up to us, we then had to lift it overhead and set it on the tower stub. The tail came up next and today we did the wiring.
I still have to pull 500 ft of #6 wire through the underground conduit and hook up to the rectifier and batteries.

The 3 #6 wires coming from the mill pass through a 12 foot long section of 1/2 inch plastic pipe which goes through the pole and rotates with the turbines yaw and keeps the wiring from rubbing on the 4 bolts that secure the pole to the top of the tree.
I have to go up one more time and put the ground wire on the tower stub. I will be installing a 3 phase lightning arrestor on the ac side of the rectifier, and a DC lightning arrestor on the DC side of the rectifier.
We took a pretty good strike to the solar this year and the several lightning arrestors did thier job very well, we only lost one cordless phone.
The forecast is calling for 15 mph wind tomorrow, so I think I will go back out and finish the wiring.