Hi again,
Thanks again for the wounderfull comments!! It does seems like it took forever, But for those of you out there don't give up!! The day will come and the hard work will be worth it and rewarding. I couldn't of asked for a better day. The winds died down for christmas day and the sun even came out for a while. It was cold but I could care less. I was determined to get this up but that was mostly procrastination on my part. A little insite into the project. Thanks to the Dan's for the plans. It's a copy and went together as their plans call for. I added the locking hardward for the tail so the tail could never come up and make contact with the blades. An answer to the down tube wiring, I ordered a rotary electrical union (slip ring) so I wouldn't have to worry about the wires ever getting tangled up. I ran #6 all the way up the tower and also to my rectifier box located in my barn. I used some short pieces of #10 at the top of the tower to make the necessary connections. The whole machine sits on a timmkin taper bearing and supportated at the lower end with an uhmw slip bushing I spun up at work. My tower is 80' tall with a 4' stub. I used 4" square tubing with an 8" square bolting flange at the top and bottom of 20' sections. Hope this helps you all out. Thanks again and Keep Them Flying!! Chad