Hello Birdmmjb,
Unfortunately so many details are missing it is difficult to help.
Take a look: (wire loss calculator)
http://www.powerstream.com/Wire_Size.htm
If you use copper wire, 12 gage, 20 feet long, 15 amp load (computer+mon = 200w)
The voltage drop is 1 volt as seen by the inverter.
The distance is the wire length from the battery to the inverter.
"controller shuts off power to the buss bar every time I try to connect..."
Is the controller supplying the loads to the inverter? Is it rated for 60amps?
(700w/12v = 60amps)
You mention 70 feet, 200w solar panels to battery with 12 gage = 3.428 volts drop. The panels must generate 13.8v + 3.4v or 17.2v at full power to fully charge the batteries, this is on the edge of most panels, I expect your system charging efficiencies is on the low side.
Please provide a wiring diagram showing physical lengths of wire and gage. What does the controller do, include how it's wired in!
Have fun,
Scott.