Okay dames and dudes !
I determined that my wind turbine tests failed as the work quality was poor, turbine ( affecting area ) too small for the hard/heavy geared turning generator and in some areas too weak wood quality was present.....and also some details were far from adequate for a fast turning turbine.
I can get away with my tower, but wing and the middle "shaft " have to be redone...they are now ready for cutting.
Might take a month or two.
