Another system online. 3.5kVA synchronising hybrid with ~10kWh usable mixed battery.

Wouldya believe I'm less than 1k€ into it?!

Used gear. If you buy reliable gear you can make a killing.
...and there's perks that you can't buy too!

Inverter input & output metering

Battery monitor...I am keeping my word, I did not buy another teal lemon...I had this in storage, it'll do I'll just get me spectacles to read it, there wasn't enough room for a legible display. Them TriMetrics are far superior and 60% the price.

Now that's what I call a Switch-Disconnect!

400A!

She came from a
hybrid ferry courtesy of a character from the end of the road.

Routine renewal...they replace them twice a year I think.
If anyone is looking for a temperature sensor for a Studer there's not much in 'em


I always thought it was a bittova rip-off charging a premium for thermistors...at least Studer had the decency to get a posh wan.
Here's
a MorningStar version I reverse engineered earlier. They work very well.

Compact Distro; Battery combining Buses, Master Fuse (400A Mega), 500A Shunt for the SOC meter, Sense fuses for the SOC Meter and the upcoming TriStar MPPT versus PWM battle. That'll be good. I'm optimising it for PWM...place yer bets!
....yee might have to wait until Spring...solar's about to tank for the season.

A wee bit tidier...I must reinstate the battery hospital tomorrow.
The only load is the inverter...I've never done that before..
It'd be nice to sync the fleet and get some serious kVA happening but I have to up-spec the workshop and house distribution because it won't take it, I have some changeovers and gubbins to fit also.
I'm not a qualified sparks by the way...I'm supposed to get someone who spent 4 years hanging cables off rafters to do all that for me and it's illegal to fix it after them...ha!