I failed to mention there are 2, 12" diameter reinforced concrete pillars, 6 feet deep in the center of the dug pit, beneath the "T" base. You can actually see them in the before pour picture. Yes, although slack in the picture, there are 4 guys at 40 feet and 4 more up at about 78 feet. The taught lines in the left of the pic are gin pole support guys and the pull cable. Thank you for your observations.