Too dang cold!
The only tool in a heated area is my mini lathe.
During the warm spell my wife had other ideas. Like replacing the cracked plaster with drywall in the kitchen. Still not done. What a mess.
And the guy who is going to help with some of the heavy metal work is working 6 days 12 and 16 hour shifts.
I'm stuck on some of the winding count too. A little worried the alternator will be too powerful for the blades. Like 12" blades on a garbogen.
G-