My tower is a little different than most, its a derick style that use a cantiliver mechanism to raise lower.
It's only 30 ft, but still a lot of weight on the winch that raises and lowers it. And the reason for the rebuild is my design flaw makin the pivot point to low, straining the winch. (This did start out as a smaller tower, and yes it does work).
So I had to raise the pivot point. Working with an in-place tower and pour new pillars to a new height, without binding the center pole. Grin I need to bring her down to replace the sole blade remaing on the mill with a proper set.

Full tower with a too low pivot point

The lower pivot point and rigging

Concrete form being built, that was interesting, lots of spray foam

Pillars poured with high strength concrete (glass fibers)

Form removed, Yeah!! the corners are true

From the front, I managed NOT to pinch the pipe wich would have made it impossible to ever bring down

Full Tower new base... next, cut hole in fence, redo some ofhte lattice, bring her down