Well I've never been commissioned before. Not opposed to the idea but I can't promise a speedy delivery!
The altitude and high wind conditions of your site require special consideration. I won't recommend any "mail-order" blades until we can talk about some details.
I would want to understand how bomb-proof they'd need to be, and that would lead me to ask about the site in general (turbulence) and the tail furling (reliability).
I have a bias toward wood construction, not just for appearance but for durability, too. And I think you need that.
Other details like the generator's power curve are being fine-tuned but they started out way outta whack, so maybe more tuning will continue to improve performance without needing new blades at all.
Congratulations on finally getting some output. Trouble-shooting at a distance can be difficult for us, but we feel it's satisfying to hear it's working, too.