It just keeps happening, there always seems to be some component that "can be" upgraded, I haven't been looking very hard honest.
After my inverter saga, diary here..
http://www.fieldlines.com/story/2008/5/11/14149/3310
I had a few too many cables loose, (no not screws) not to mention a spare inverter, so both inverters are now correctly wired in with a two pole change over switch and two pole isolation circuit breaker.


Then there was the solar panels that had tempory wiring after mounting them on a tracking frame, so a day or so later each panel is wired back to a fuse in the junction box and a new 16mm Sq cable back to the control centre.
This is how they were.

Now.

Since the duel rotor has been up (2 years) the power has come in through some salvage 16mm sq aerial, laying on the ground. And to make allowance for the conversion I have run a new cable out to a junction box adjacent to the conversion tower, its now on that post at the end of the shadow..

And the conversion waiting to fly again, this unit will be specifically for the summer overnight winds, while it will get wind from other direction it's sited for those winds.

No that is not the blades for it, they have yet to be carved.
I have tidied up the shunt cabeling into one box.

Then there are the top batteries waiting to be relocated to ground level, the other solar panels to rewire, and the small duel rotor I have been working on for at least 12 months it never ends.
Now nothing to do with Re but, these two were the last of the first group of winter backpackers to leave early this month. The two Irish guys had already gone, little could be said about them, surfice to say anybody who need a balaclava as a beanie.

The bartteries

allan down under