I do not have any other pipes or tubes in the garage. Yeah sure. PVC sewage pipes I have laying around still but I am guessing let's not start using that

hahah
But if I can wait for the delivery time then I can buy pretty much anything that is sold. Also business to business vendors only I can tap into so that means large scale construction project type of things.
But I would prefer to keep it consumer based. It brings added securities and in general less potential hassle. {3}And lets not forget the likeliness that one can also build something similar. I mean if I were to introduce highly specialized things to this build then that basically makes this project only meant to serve my power needs, yet completely forgoes on the humanitarian aspect of this project{3}
But I have been eye balling to go aluminum for some time now. And 'only' a 10 day delivery time.
Their largest size is
diam. 100 x wall 5 MM 6060 T6
the weight increase over the current pipe per meter would be around 1 kg. But since we are now only talking a length of 2m rather than the original 3 that increase is still within the limits of the taper roller bearing. (I must stress though that this assertion is gut feeling based and not on basis of actual technical listed properties)
You know what? As I am closing my thoughts and about to hit the post button I realize that I know far too little at this stage to start buying extra material again.
But I will leave the thought process above here anyway.
I think I had better repurpose the wooden feet beams first as body armor and get this top arm holder to not move anymore. I think then we have a better position to assess the weak points that are left and how to address them.
{1}hahah not all of the wooden feet beams of course are needed for the body armor. I am still looking to keep the load bearing structure and the retaining (the parts, like guy wires, used to keep the load bearing structure upright) structure as little wind catching as possible

{1}
{2} and that is an example of what keeps me from jumping straight to the 100mm alu pipe I mentioned here. I just do not know the added load it will bring on the retaining structure. Now I would be happy if Mary would give some fast and loose pointers on how to calculate that but I would also fully understand if there are just too many tiny factors at play here that field testing is the only way to know for sure{2}